{"id":3739,"date":"2025-11-29T13:22:24","date_gmt":"2025-11-29T12:22:24","guid":{"rendered":"https:\/\/www.marconiexpress.it\/?p=3739"},"modified":"2025-12-03T13:48:44","modified_gmt":"2025-12-03T12:48:44","slug":"tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation","status":"publish","type":"post","link":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/","title":{"rendered":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation"},"content":{"rendered":"<p>Marconi Express announces that, for technical and safety reasons, on Tuesday 2 December from 5.40 a.m., the monorail service will be suspended to allow a vehicle to be relocated on the line. A replacement shuttle bus service will be activated at the same time, with the following departure points:<\/p>\n<ul>\n<li>at the airport on the ground floor at the arrivals exit;<\/li>\n<li>at Lazzaretto station in Via Terracini;<\/li>\n<li>at the central station in Via Carracci.<\/li>\n<\/ul>\n<p>The journey takes approximately 25 minutes, with an intermediate stop at Lazzaretto station. The cost and method of purchasing tickets for the shuttle bus service are the same as for the monorail service.<\/p>\n<p>The monorail service will resume operations as soon as the work is completed, which is expected to be within the day. It will run with two vehicles coupled together in a \u201cshuttle\u201d configuration, with a frequency of 15 minutes. This arrangement allows the number of passengers carried on each trip to be doubled, reducing the time taken to board and alight from the vehicles. The frequency specified in the operating regulations will be restored as soon as possible.<\/p>\n<p>Should there be any changes to the schedule, updated information will be provided on the website and all Marconi Express channels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Marconi Express announces that, for technical and safety reasons, on Tuesday 2 December from 5.40 a.m., the monorail service will be suspended to allow a vehicle to be relocated on the line. A replacement shuttle bus service will be activated at the same time, with the following departure points: at the airport on the ground [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":2187,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[23],"tags":[],"class_list":["post-3739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express<\/title>\n<meta name=\"description\" content=\"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express\" \/>\n<meta property=\"og:description\" content=\"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Marconi Express\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-29T12:22:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-03T12:48:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"410\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Manfredi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Manfredi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/\"},\"author\":{\"name\":\"Manfredi\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#\\\/schema\\\/person\\\/f5ec0f59b834d3c9fde260e7f0e1e5cb\"},\"headline\":\"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation\",\"datePublished\":\"2025-11-29T12:22:24+00:00\",\"dateModified\":\"2025-12-03T12:48:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/\"},\"wordCount\":217,\"publisher\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/730x410_MEX-news_01.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/\",\"url\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/\",\"name\":\"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/730x410_MEX-news_01.jpg\",\"datePublished\":\"2025-11-29T12:22:24+00:00\",\"dateModified\":\"2025-12-03T12:48:44+00:00\",\"description\":\"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/730x410_MEX-news_01.jpg\",\"contentUrl\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/730x410_MEX-news_01.jpg\",\"width\":730,\"height\":410,\"caption\":\"Banner news\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.marconiexpress.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#website\",\"url\":\"https:\\\/\\\/www.marconiexpress.it\\\/\",\"name\":\"Marconi Express\",\"description\":\"Dall&#039;aeroporto al centro di Bologna in 7 minuti\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.marconiexpress.it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#organization\",\"name\":\"Marconi Express\",\"url\":\"https:\\\/\\\/www.marconiexpress.it\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/logomex.png\",\"contentUrl\":\"https:\\\/\\\/www.marconiexpress.it\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/logomex.png\",\"width\":200,\"height\":43,\"caption\":\"Marconi Express\"},\"image\":{\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.marconiexpress.it\\\/#\\\/schema\\\/person\\\/f5ec0f59b834d3c9fde260e7f0e1e5cb\",\"name\":\"Manfredi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g\",\"caption\":\"Manfredi\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express","description":"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/","og_locale":"en_US","og_type":"article","og_title":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express","og_description":"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.","og_url":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/","og_site_name":"Marconi Express","article_published_time":"2025-11-29T12:22:24+00:00","article_modified_time":"2025-12-03T12:48:44+00:00","og_image":[{"width":730,"height":410,"url":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg","type":"image\/jpeg"}],"author":"Manfredi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Manfredi","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#article","isPartOf":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/"},"author":{"name":"Manfredi","@id":"https:\/\/www.marconiexpress.it\/#\/schema\/person\/f5ec0f59b834d3c9fde260e7f0e1e5cb"},"headline":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation","datePublished":"2025-11-29T12:22:24+00:00","dateModified":"2025-12-03T12:48:44+00:00","mainEntityOfPage":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/"},"wordCount":217,"publisher":{"@id":"https:\/\/www.marconiexpress.it\/#organization"},"image":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/","url":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/","name":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation - Marconi Express","isPartOf":{"@id":"https:\/\/www.marconiexpress.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#primaryimage"},"image":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg","datePublished":"2025-11-29T12:22:24+00:00","dateModified":"2025-12-03T12:48:44+00:00","description":"Shuttle bus transfers last about 25 minutes, with an intermediate stop at Lazzaretto station.","breadcrumb":{"@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#primaryimage","url":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg","contentUrl":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2022\/12\/730x410_MEX-news_01.jpg","width":730,"height":410,"caption":"Banner news"},{"@type":"BreadcrumbList","@id":"https:\/\/www.marconiexpress.it\/en\/tuesday-2-december-monorail-service-suspended-for-technical-maintenance-shuttle-buses-in-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.marconiexpress.it\/en\/"},{"@type":"ListItem","position":2,"name":"Tuesday 2 December, from 5:40 a.m., monorail service suspended for technical maintenance: shuttle buses in operation"}]},{"@type":"WebSite","@id":"https:\/\/www.marconiexpress.it\/#website","url":"https:\/\/www.marconiexpress.it\/","name":"Marconi Express","description":"Dall&#039;aeroporto al centro di Bologna in 7 minuti","publisher":{"@id":"https:\/\/www.marconiexpress.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.marconiexpress.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.marconiexpress.it\/#organization","name":"Marconi Express","url":"https:\/\/www.marconiexpress.it\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.marconiexpress.it\/#\/schema\/logo\/image\/","url":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2019\/02\/logomex.png","contentUrl":"https:\/\/www.marconiexpress.it\/wp-content\/uploads\/2019\/02\/logomex.png","width":200,"height":43,"caption":"Marconi Express"},"image":{"@id":"https:\/\/www.marconiexpress.it\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.marconiexpress.it\/#\/schema\/person\/f5ec0f59b834d3c9fde260e7f0e1e5cb","name":"Manfredi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cde450347d411470220de11d10444711bd19664508a2c4413009a0c14276b510?s=96&d=mm&r=g","caption":"Manfredi"}}]}},"_links":{"self":[{"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/posts\/3739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/comments?post=3739"}],"version-history":[{"count":2,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/posts\/3739\/revisions"}],"predecessor-version":[{"id":3751,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/posts\/3739\/revisions\/3751"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/media\/2187"}],"wp:attachment":[{"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/media?parent=3739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/categories?post=3739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marconiexpress.it\/en\/wp-json\/wp\/v2\/tags?post=3739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}